When are stormwater permits required?

A minor stormwater permit is required for projects that create less than 5,000 square feet of impervious surface. Land clearing also requires a minor stormwater permit. For larger projects, a major stormwater permit is required. Typically a major stormwater project requires the services of a licensed engineer.